Safe operation of small concrete mixer must know, small concrete mixer safe operation daily maintenance mainly has three aspects: ① car body maintenance, including paint, cushion carpet, bumper, skirt, instrument panel, tire, wheel hub, windshield, chassis, etc. ② In car maintenance, including: lubrication system, fuel system, cooling system, brake system, carburetor (injector) maintenance, etc. ③ Car body renovation, including the diagnosis and treatment of deep scratches, multi material bumper repair, wheel hub (cover) hard damage repair, leather, chemical fiber material renovation, engine color renovation, etc.
注册送200可提现的打鱼
起头任务前,起首查抄油箱、液压泵、马达内是不是有充沛的洁净的液压油,水箱是不是灌满水,各光滑部位是不是有充沛的光滑油。策动汽车策念头运行半晌,向贮气筒充沛气。把支配油泵伺服阀的手柄放在中间地位,此时搅拌筒处于运动状况。统统一般后,支配手柄使搅拌筒在低速下正反转2~3次,查抄液压传动体系是不是一般。
Before the small concrete mixer starts to work, first check whether there is enough clean hydraulic oil in the oil tank, hydraulic pump and madar, whether the water tank is filled with water, and whether there is enough lubricating oil in each lubricating part. Start the car engine, run for a moment, and fill the air reservoir with air. Put the handle of the servo valve of the oil pump in the central position, and the mixing drum is in a static state. After everything is normal, operate the handle to make the mixing drum rotate forward and backward at low speed for 2 ~ 3 times, and check whether the hydraulic transmission system is normal.
注册送200可提现的打鱼
把车开到搅拌站加料漏斗下,使车的进料斗口与搅拌站的出料漏斗口对正,避免混凝土流到车里面形成华侈和净化车体。打金鱼
支配手柄,使搅拌筒正传达10~12r/min,这时候候可向搅拌筒进料。料装到公称搅动容量时,支配手柄,将策念头转速调为1800r/min时,使搅拌筒的搅动转速为1~3r/min,使策念头转速为最小后,而后在驾驶室锁住手柄,把车开至好货地点。
The small concrete mixer truck drives the truck under the feeding hopper of the mixing station to align the inlet of the truck with that of the discharge hopper of the mixing station, so as to prevent the concrete from flowing outside the vehicle, causing waste and pollution to the vehicle body. Operate the handle of the mixer truck to make the mixing drum transfer 10 ~ 12R / min, and then the material can be fed to the mixing drum. When the material is loaded to the nominal stirring capacity, control the handle, adjust the engine speed to 1800r / min, make the stirring speed of the mixing cylinder be 1 ~ 3R / min, make the engine speed is the minimum, then lock the handle in the cab and drive the vehicle to the delivery place.
打鱼注册送分
从进料起头到卸料终了许可的最大时候为1.5小时或拌筒扭转300转(取此中时候短者)。车辆满载上坡应恰当使拌筒扭转速率加速。车到交货地点后,把卸料溜槽和加长溜槽转向需卸料的地位。在支配车辆尾部两侧手柄前,应解开驾驶室支配定位锁紧板,能力实现拌筒尾部正反转支配。而后按照工地请求的速率停止卸料。
The maximum time allowed for the concrete mixer truck from the beginning of feeding to the completion of unloading is 1.5 hours or 300 revolutions of mixing drum (whichever is shorter). When the vehicle is loaded uphill, the rotation speed of mixing drum shall be accelerated properly. After the vehicle arrives at the delivery place, turn the unloading chute and lengthened chute to the place where the unloading is required. Before operating the handles on both sides of the tail of the vehicle, the locking plate of the control and positioning of the cab should be untied to realize the forward and reverse operation of the mixing drum tail. Then according to the site requirements of the speed of unloading.