1.打金鱼 策念头启动后,搅拌筒应低速运行约10分钟,以便在激活液压油之前,液压油的温度升至20°C以上。
1. After the mixer engine is started, the mixer drum should run at a low speed for about 10 minutes, so that the temperature of the hydraulic oil rises to 20 ℃ before activating the hydraulic oil ° C or above.
2.在此之前,将搅拌桶高低倒置。
2. Before that, turn the mixing drum upside down.
6.主动喂料搅拌机运输的混凝土坍落度必须最少为8厘米。从混凝土进入储罐到卸货,温度在低温下不应跨越2小时,在阴雨天则不应跨越2.5小时。
6. The slump of concrete transported by automatic feeding mixer must be at least 8 cm. From the time of concrete entering the storage tank to unloading, the temperature should not exceed 2 hours under high temperature and 2.5 hours in rainy days.
7.在从搅拌机中掏出混凝土之前,应将搅拌槽以10-12 rpm的转速扭转1分钟。
7. The mixing tank shall be rotated at 10-12 rpm for 1 minute before concrete is removed from the mixer.
8.混凝土搅拌机卸载汽车后,利用卡车软管洁净进水口,卸载料斗和卸载箱之类的整机,以断根卡车车身各个局部上的尘埃和残留混凝土。倒入搅拌桶中,注入150-。 200公升纯洁水。在前往进程中,迟缓扭转夹杂槽以洁净内壁,以防止残留的炉渣粘附到夹杂槽壁和夹杂叶片上,并在从头加注之前将水排干。
8. After unloading the truck with the concrete mixer, use the truck hose to clean the water inlet, unloading hopper, unloading box and other parts to remove the dust and residual concrete on each part of the truck body. Pour into the mixing drum and add 150 -. 200 liters of purified water. During the return process, slowly rotate the mixing tank to clean the inner wall to prevent the residual slag from adhering to the mixing tank wall and mixing blades, and drain the water before refilling.
9.当打鱼注册送分 运输混凝土时,策念头转速应在1000-1400 rpm的规模内,以确保策念头的最大扭矩。在运输混凝土的进程中,为了宁静驾驶,车速不应跨越40 km / h。
9. When the concrete mixer transports concrete, the engine speed should be in the range of 1000-1400rpm to ensure the maximum torque of the engine. In the process of transporting concrete, in order to drive safely, the speed should not exceed 40 km / h.
10.实现水泥打金鱼 的任务后,洁净打金鱼 的外部和主体,不要在打金鱼 上留下任何残留的混凝土。
10. After finishing the work of the cement mixer, clean the inside and main body of the mixer, and do not leave any residual concrete on the mixer.
1.1。在起头搅拌机轨道之前,搅拌机鼓的操纵手柄必须处于“遏制”地位。
1.1。 Before starting the mixer track, the operating handle of the mixer drum must be in the "stop" position.
2.2。打金鱼 启动策念头后,以低速扭转搅拌桶约10分钟,以使液压油温度跨越20°C,而后再起头运行。
2.2。 After the mixer starts the engine, rotate the mixing drum at a low speed for about 10 minutes to make the hydraulic oil temperature exceed 20 ℃ ° C. Then start running again.
3.3。若是打金鱼 停在室外,则在装载前应将搅拌桶倒转以排放水和碎屑,以确保混凝土品质。
3.3。 If the mixer truck is parked outside, the mixing drum should be reversed to drain water and debris before loading to ensure the quality of concrete.
4.4。打金鱼 运输混凝土时,必须将其安稳安排,以避免因松动滑桶,破坏行人或影响其余车辆的一般运行而摆动。
4.4。 When concrete is transported by mixer truck, it must be placed firmly to avoid swinging due to loosening sliding bucket, damaging pedestrians or affecting normal operation of other vehicles.
5.当打金鱼 装载夹杂混凝土时,搅拌桶的速率为2-10 rpm。在运输进程中,在平展路面上搅拌桶的速率保障为2-3 rpm。在跨越50的侧坡下行驶和在摆布扭捏较大的途径下行驶时,必须在路面状态获得改良后遏制夹杂料灌浆并从头起头夹杂料灌浆。
注册送200可提现的打鱼
5. When the mixer truck loads the mixed concrete, the speed of the mixing drum is 2-10 rpm. During transportation, the speed of the mixing drum is guaranteed to be 2-3 rpm on the flat road. When driving on the side slope over 50 and on the road with large left-right swing, the mixture grouting must be stopped and restarted after the road condition is improved.
6.打鱼注册送分 运输混凝土的时候不得跨越搅拌站划定的时候。在运输混凝土时代,请勿永劫候遏制搅拌桶,以防止混凝土偏析。
6. The time of transporting concrete by concrete mixer truck shall not exceed the time specified by mixing station. During the transportation of concrete, do not stop the mixing bucket for a long time to prevent concrete segregation.
7.若是打金鱼 装满混凝土,现场障碍时候不应跨越一小时。若是超时,现场职员将不得不实时处置。
7. If the mixer truck is full of concrete, the site dead time shall not exceed one hour. In case of overtime, the on-site personnel will have to deal with it in time.
8.打金鱼 运输的混凝土块必须最少8厘米。从混凝土进入储罐起头直至排挤为止,在酷热气候下排挤不应跨越2小时,在严寒气候下排挤不应跨越2.5小时。
8. Concrete blocks transported by mixer truck must be at least 8 cm. From the beginning of concrete entering the storage tank to discharging, the discharging time shall not exceed 2 hours in hot weather and 2.5 hours in cold weather.
9.在打金鱼 弹出混凝土之前,以10-12 rpm的速率扭转搅拌桶1分钟,而后弹出。
9. Before the concrete is ejected by the mixer truck, rotate the mixing drum at the speed of 10-12 rpm for 1 minute, and then eject.
10.混凝土搅拌机排干车后,当即利用卡车附带的软管冲刷进水口,排水料斗和排水槽,以断根车身上的污垢和残留的混凝土。将150-200L的净水倒入搅拌桶中。
10. After the concrete mixer dries the truck, immediately use the hose attached to the truck to flush the water inlet, drain hopper and drain trough to remove dirt and residual concrete from the truck body. Pour 150-200l clean water into the mixing bucket.
以上的出色内容来自:注册送200可提现的打鱼 更多的出色内容请点击进入咱们的网站:http://zhaoyanfilter.com,咱们后续会有更多的出色内容等您检查,请持续存眷咱们。
The above wonderful content comes from: small concrete mixer. For more wonderful content, please click to enter our website: http://zhaoyanfilter.com , we will have more wonderful content waiting for you to check, please continue to pay attention to us.
上一篇:主动上料搅拌机液压油温度高是甚么缘由?
下一篇:主动上料打鱼注册送分 在利用中应当注重甚么?
tag:打鱼注册送分 ,注册送200可提现的打鱼 ,打鱼注册送分200元
以后地位: 首页 - 消息资讯 > 行业资讯 >

主动上料打鱼注册送分 在利用中应当注重甚么?

作者:中科聚峰打鱼注册送分 厂家 时候:2021-04-23

1.打金鱼 策念头启动后,搅拌筒应低速运行约10分钟,以便在激活液压油之前,液压油的温度升至20°C以上。
1. After the mixer engine is started, the mixer drum should run at a low speed for about 10 minutes, so that the temperature of the hydraulic oil rises to 20 ℃ before activating the hydraulic oil ° C or above.
2.在此之前,将搅拌桶高低倒置。
2. Before that, turn the mixing drum upside down.
6.主动喂料搅拌机运输的混凝土坍落度必须最少为8厘米。从混凝土进入储罐到卸货,温度在低温下不应跨越2小时,在阴雨天则不应跨越2.5小时。
6. The slump of concrete transported by automatic feeding mixer must be at least 8 cm. From the time of concrete entering the storage tank to unloading, the temperature should not exceed 2 hours under high temperature and 2.5 hours in rainy days.
7.在从搅拌机中掏出混凝土之前,应将搅拌槽以10-12 rpm的转速扭转1分钟。
7. The mixing tank shall be rotated at 10-12 rpm for 1 minute before concrete is removed from the mixer.
8.混凝土搅拌机卸载汽车后,利用卡车软管洁净进水口,卸载料斗和卸载箱之类的整机,以断根卡车车身各个局部上的尘埃和残留混凝土。倒入搅拌桶中,注入150-。 200公升纯洁水。在前往进程中,迟缓扭转夹杂槽以洁净内壁,以防止残留的炉渣粘附到夹杂槽壁和夹杂叶片上,并在从头加注之前将水排干。
8. After unloading the truck with the concrete mixer, use the truck hose to clean the water inlet, unloading hopper, unloading box and other parts to remove the dust and residual concrete on each part of the truck body. Pour into the mixing drum and add 150 -. 200 liters of purified water. During the return process, slowly rotate the mixing tank to clean the inner wall to prevent the residual slag from adhering to the mixing tank wall and mixing blades, and drain the water before refilling.
9.当打鱼注册送分 运输混凝土时,策念头转速应在1000-1400 rpm的规模内,以确保策念头的最大扭矩。在运输混凝土的进程中,为了宁静驾驶,车速不应跨越40 km / h。
9. When the concrete mixer transports concrete, the engine speed should be in the range of 1000-1400rpm to ensure the maximum torque of the engine. In the process of transporting concrete, in order to drive safely, the speed should not exceed 40 km / h.
10.实现水泥打金鱼 的任务后,洁净打金鱼 的外部和主体,不要在打金鱼 上留下任何残留的混凝土。
10. After finishing the work of the cement mixer, clean the inside and main body of the mixer, and do not leave any residual concrete on the mixer.
1.1。在起头搅拌机轨道之前,搅拌机鼓的操纵手柄必须处于“遏制”地位。
1.1。 Before starting the mixer track, the operating handle of the mixer drum must be in the "stop" position.
2.2。打金鱼 启动策念头后,以低速扭转搅拌桶约10分钟,以使液压油温度跨越20°C,而后再起头运行。
2.2。 After the mixer starts the engine, rotate the mixing drum at a low speed for about 10 minutes to make the hydraulic oil temperature exceed 20 ℃ ° C. Then start running again.
3.3。若是打金鱼 停在室外,则在装载前应将搅拌桶倒转以排放水和碎屑,以确保混凝土品质。
3.3。 If the mixer truck is parked outside, the mixing drum should be reversed to drain water and debris before loading to ensure the quality of concrete.
4.4。打金鱼 运输混凝土时,必须将其安稳安排,以避免因松动滑桶,破坏行人或影响其余车辆的一般运行而摆动。
4.4。 When concrete is transported by mixer truck, it must be placed firmly to avoid swinging due to loosening sliding bucket, damaging pedestrians or affecting normal operation of other vehicles.
5.当打金鱼 装载夹杂混凝土时,搅拌桶的速率为2-10 rpm。在运输进程中,在平展路面上搅拌桶的速率保障为2-3 rpm。在跨越50的侧坡下行驶和在摆布扭捏较大的途径下行驶时,必须在路面状态获得改良后遏制夹杂料灌浆并从头起头夹杂料灌浆。
注册送200可提现的打鱼
5. When the mixer truck loads the mixed concrete, the speed of the mixing drum is 2-10 rpm. During transportation, the speed of the mixing drum is guaranteed to be 2-3 rpm on the flat road. When driving on the side slope over 50 and on the road with large left-right swing, the mixture grouting must be stopped and restarted after the road condition is improved.
6.打鱼注册送分 运输混凝土的时候不得跨越搅拌站划定的时候。在运输混凝土时代,请勿永劫候遏制搅拌桶,以防止混凝土偏析。
6. The time of transporting concrete by concrete mixer truck shall not exceed the time specified by mixing station. During the transportation of concrete, do not stop the mixing bucket for a long time to prevent concrete segregation.
7.若是打金鱼 装满混凝土,现场障碍时候不应跨越一小时。若是超时,现场职员将不得不实时处置。
7. If the mixer truck is full of concrete, the site dead time shall not exceed one hour. In case of overtime, the on-site personnel will have to deal with it in time.
8.打金鱼 运输的混凝土块必须最少8厘米。从混凝土进入储罐起头直至排挤为止,在酷热气候下排挤不应跨越2小时,在严寒气候下排挤不应跨越2.5小时。
8. Concrete blocks transported by mixer truck must be at least 8 cm. From the beginning of concrete entering the storage tank to discharging, the discharging time shall not exceed 2 hours in hot weather and 2.5 hours in cold weather.
9.在打金鱼 弹出混凝土之前,以10-12 rpm的速率扭转搅拌桶1分钟,而后弹出。
9. Before the concrete is ejected by the mixer truck, rotate the mixing drum at the speed of 10-12 rpm for 1 minute, and then eject.
10.混凝土搅拌机排干车后,当即利用卡车附带的软管冲刷进水口,排水料斗和排水槽,以断根车身上的污垢和残留的混凝土。将150-200L的净水倒入搅拌桶中。
10. After the concrete mixer dries the truck, immediately use the hose attached to the truck to flush the water inlet, drain hopper and drain trough to remove dirt and residual concrete from the truck body. Pour 150-200l clean water into the mixing bucket.