您好,接待惠临威尼斯注册送200官方网站!

你地点地位: 首页 >> 消息资讯 > 行业资讯 >
行业资讯

宁静利用主动上料打金鱼 你晓得的宁静常识

来历:http://zhaoyanfilter.com/ 时候:2021-02-10

1.在启动打金鱼 之前,应将搅拌桶的操纵手柄置于“遏制”地位。
1. Before starting the mixer, the operating handle of the mixing drum should be placed in the "stop" position.
2.打金鱼 启动策念头后,应将搅拌筒低速扭转约10分钟,以使液压油温度升至20°C以上才能任务。
2. After the mixer starts the engine, rotate the mixer drum at low speed for about 10 minutes to make the hydraulic oil temperature rise above 20 ° C.
3.当打金鱼 停在空阔的处所时,应在装载前将搅拌桶倒转以排挤水和碎屑,以确保混凝土的品质。
3. When the mixer truck stops in an open place, the mixing bucket shall be reversed before loading to discharge water and debris, so as to ensure the quality of concrete.
4.在打金鱼 运输混凝土时,必须确保安稳安排滑动铲斗,以防止其因松动而扭捏,危险行人或影响其余车辆的一般运转。
4. When the concrete is transported by the mixer truck, the sliding bucket must be firmly placed to prevent it from swinging due to looseness, injuring pedestrians or affecting the normal operation of other vehicles.
打鱼注册送分
5.当打金鱼 装载夹杂混凝土时,搅拌桶的速率为2-10 rpm。在运输进程中,在平展途径上搅拌桶的速率保障为2-3 rpm。在大于50的边坡下行驶时在路面或摆布晃悠较大的途径上,应遏制夹杂扭转,并在途径状态改良后规复夹杂扭转。
5. When the mixer truck loads the mixed concrete, the speed of the mixing drum is 2-10 rpm. During transportation, the speed of the mixing drum is guaranteed to be 2-3 rpm on a flat road. When driving on the slope of more than 50, the mixing rotation should be stopped on the road or the road with large left and right shaking, and the mixing rotation should be restored after the road condition is improved.
6.打鱼注册送分 运输混凝土的时候不应跨越搅拌站划定的时候。在运输混凝土的进程中,不得永劫候遏制搅拌桶以防止混凝土偏析。
6. The time of transporting concrete by concrete mixer truck shall not exceed the time specified by mixing station. During the transportation of concrete, the mixing bucket shall not be stopped for a long time to prevent concrete segregation.
7.当打金鱼 装满混凝土时,现场障碍时候不得跨越1小时。若是时候到了,应请求现场担任人实时处置。
7. When the mixer truck is full of concrete, the on-site dead time shall not exceed 1 hour. If the time is up, the person in charge of the site shall be required to deal with it in time.
8.打金鱼 运输的混凝土坍落度不得小于8厘米。从混凝土进入储罐起头到卸料,在低温下卸料时候不得跨越2小时,在阴雨天气下则不得跨越2.5小时。
8. The slump of concrete transported by mixer truck shall not be less than 8 cm. The time from concrete entering the storage tank to discharging shall not exceed 2 hours under high temperature and 2.5 hours under rainy weather.
9.在打金鱼 卸出混凝土之前,搅拌筒在卸出前应以10-12 rpm的速率扭转1分钟。
9. Before the concrete is unloaded by the mixer truck, the mixing drum shall rotate at a speed of 10-12 rpm for 1 minute before unloading.
10.打鱼注册送分 实现卸料后,当即利用随车供给的软管冲刷入口,卸料斗和卸料斜槽,并断根粘在车体上的污垢和残留混凝土。将150-200L的净水倒入搅拌桶中。在前往途中,应迟缓扭转搅拌桶,以洁净内壁,并防止残留的炉渣粘附在搅拌桶壁和搅拌叶片上,并在再次灌水之前先将水倒入。
10. After the concrete mixer truck finishes discharging, immediately use the hose provided with the truck to flush the inlet, discharge hopper and discharge chute, and remove the dirt and residual concrete adhered to the car body. Pour 150-200l clean water into the mixing bucket. On the way back, the mixing drum should be rotated slowly to clean the inner wall, and to avoid the residual slag adhering to the mixing drum wall and mixing blades, and the water should be poured into the mixing drum before the water is injected again.
以上的出色内容来自:打鱼注册送分 具体的内容请点击进入咱们的网站遏制查问对接:http://zhaoyanfilter.com/
The above wonderful content comes from: for the detailed content of concrete mixer, please click to enter our website for query and docking: http://zhaoyanfilter.com/
上一篇:自上料打鱼注册提现金 顺应才能强在哪?
下一篇:打鱼注册送分 辆为甚么须要降温?
tag:打鱼注册送分 ,注册送200可提现的打鱼 ,打鱼注册送分200元
以后地位: 首页 - 消息资讯 > 行业资讯 >

宁静利用主动上料打金鱼 你晓得的宁静常识

作者:中科聚峰打鱼注册送分 厂家 时候:2021-02-10

1.在启动打金鱼 之前,应将搅拌桶的操纵手柄置于“遏制”地位。
1. Before starting the mixer, the operating handle of the mixing drum should be placed in the "stop" position.
2.打金鱼 启动策念头后,应将搅拌筒低速扭转约10分钟,以使液压油温度升至20°C以上才能任务。
2. After the mixer starts the engine, rotate the mixer drum at low speed for about 10 minutes to make the hydraulic oil temperature rise above 20 ° C.
3.当打金鱼 停在空阔的处所时,应在装载前将搅拌桶倒转以排挤水和碎屑,以确保混凝土的品质。
3. When the mixer truck stops in an open place, the mixing bucket shall be reversed before loading to discharge water and debris, so as to ensure the quality of concrete.
4.在打金鱼 运输混凝土时,必须确保安稳安排滑动铲斗,以防止其因松动而扭捏,危险行人或影响其余车辆的一般运转。
4. When the concrete is transported by the mixer truck, the sliding bucket must be firmly placed to prevent it from swinging due to looseness, injuring pedestrians or affecting the normal operation of other vehicles.
打鱼注册送分
5.当打金鱼 装载夹杂混凝土时,搅拌桶的速率为2-10 rpm。在运输进程中,在平展途径上搅拌桶的速率保障为2-3 rpm。在大于50的边坡下行驶时在路面或摆布晃悠较大的途径上,应遏制夹杂扭转,并在途径状态改良后规复夹杂扭转。
5. When the mixer truck loads the mixed concrete, the speed of the mixing drum is 2-10 rpm. During transportation, the speed of the mixing drum is guaranteed to be 2-3 rpm on a flat road. When driving on the slope of more than 50, the mixing rotation should be stopped on the road or the road with large left and right shaking, and the mixing rotation should be restored after the road condition is improved.
6.打鱼注册送分 运输混凝土的时候不应跨越搅拌站划定的时候。在运输混凝土的进程中,不得永劫候遏制搅拌桶以防止混凝土偏析。
6. The time of transporting concrete by concrete mixer truck shall not exceed the time specified by mixing station. During the transportation of concrete, the mixing bucket shall not be stopped for a long time to prevent concrete segregation.
7.当打金鱼 装满混凝土时,现场障碍时候不得跨越1小时。若是时候到了,应请求现场担任人实时处置。
7. When the mixer truck is full of concrete, the on-site dead time shall not exceed 1 hour. If the time is up, the person in charge of the site shall be required to deal with it in time.
8.打金鱼 运输的混凝土坍落度不得小于8厘米。从混凝土进入储罐起头到卸料,在低温下卸料时候不得跨越2小时,在阴雨天气下则不得跨越2.5小时。
8. The slump of concrete transported by mixer truck shall not be less than 8 cm. The time from concrete entering the storage tank to discharging shall not exceed 2 hours under high temperature and 2.5 hours under rainy weather.
9.在打金鱼 卸出混凝土之前,搅拌筒在卸出前应以10-12 rpm的速率扭转1分钟。
9. Before the concrete is unloaded by the mixer truck, the mixing drum shall rotate at a speed of 10-12 rpm for 1 minute before unloading.
10.打鱼注册送分 实现卸料后,当即利用随车供给的软管冲刷入口,卸料斗和卸料斜槽,并断根粘在车体上的污垢和残留混凝土。将150-200L的净水倒入搅拌桶中。在前往途中,应迟缓扭转搅拌桶,以洁净内壁,并防止残留的炉渣粘附在搅拌桶壁和搅拌叶片上,并在再次灌水之前先将水倒入。
10. After the concrete mixer truck finishes discharging, immediately use the hose provided with the truck to flush the inlet, discharge hopper and discharge chute, and remove the dirt and residual concrete adhered to the car body. Pour 150-200l clean water into the mixing bucket. On the way back, the mixing drum should be rotated slowly to clean the inner wall, and to avoid the residual slag adhering to the mixing drum wall and mixing blades, and the water should be poured into the mixing drum before the water is injected again.
以上的出色内容来自:打鱼注册送分 具体的内容请点击进入咱们的网站遏制查问对接:http://zhaoyanfilter.com/
The above wonderful content comes from: for the detailed content of concrete mixer, please click to enter our website for query and docking: http://zhaoyanfilter.com/